<aside>
<img src="/icons/reorder_gray.svg" alt="/icons/reorder_gray.svg" width="40px" /> Home | Projects | People | Publications | Patents | Lab Facilities | News | Photo Gallery
</aside>

Current Government-Funded Projects
Development of an Open-integrated Platform for Distributed Renewable Energy Systems
- Funding resource: Korea Institute of Energy Technology Evaluation and Planning (KETEP)
- $321K (approx. KRW 0.4B) (04.2023 - 03.2026)
Optimal Operation of Heterogeneous Energy Sector-integrated Networks Considering Operational Uncertainty
- Funding resource: National Research Foundation of Korea
- $696K (approx. KRW 1.0B) (05.2024 - 04.2030)
Development of Multi-sector Coupling Core Technology for Increasing Receptivity of Variable Renewable Energy
- Funding resource: National Research Council of Science and Technology
- $579K (approx. KRW 0.75B) (07.2023 - 06.2029)
Resilient Autonomous Grid Research Center
- Funding resource: National Research Foundation of Korea
- $632K (approx. KRW 0.8B) (06.2023 - 02.2030)
Past Projects
On-line Re-Evaluation of Variable F/R Reserve and Development of Fast State Estimation Algorithm Based on PMU data
- Funding resource: KEPCO
- $77K (01.2019 – 06.2021)
Network Optimized Distributed Energy Systems (DE-FOA-0001289)
- Co-principal investigator (in section of Modeling HVAC & Aggregated Building Loads)
- Funding resource: U.S. Department of Energy (DOE)
- Partner: Argonne National Laboratory (ANL)
- $45K (05.2017 – 04.2018)
Big Data-Driven Optimal Operation of Building Energy Systems
- Funding resource: Ministry of SMEs and Startups
- Partner: Quartz Sys
- 10.2017 – 09.2019
Coordination between Smart Grid and a Cluster of Smart Buildings
- Principal investigator
- Funding resource: National Research Foundation of Korea
- $365K (approx. KRW 0.4B) (12.2016 – 11.2019)
Development of SW Operating System and Service Functions in Advanced Distribution Management System (ADMS)
- Specific topic: Estimation of Power Outputs of Sensorless PV Systems in Wide-Area Distribution Feeders
- Funding resource: KEPCO
- $60K (06.2019 – 12.2020)
Analysis and Improvement of Operating Reliability and Resiliency of Re-configurable Microgrids Including Power-to-Gas Energy Resources
- Funding resource: KEPCO
- $67K (02.2020 – 01.2022)
Determining Optimal Topology of New Distribution Network for Semiconductor Manufacturing Facilities
- Funding resource: Samsung Electronics
- 01.2022 – 10.2022